Several infeed lanes can recover at different speeds after a stop. Ask the case packer supplier to demonstrate an authorised low-supply scenario. Specify the normal grouping pattern and observe which lanes are ready when the machine resumes. Confirm how incomplete groups are handled.
Follow the lane sequence into the carton
Use production bottles and record the first correctly loaded carton. Include any carton that waits or is diverted. Align the observed lane conditions and machine signals with the event time. Ask the equipment supplier who will confirm the integration upstream.
| Event | Evidence | Result |
|---|---|---|
| Lane falls below expected supply | Lane, time and indicated state | ___ |
| Packer waits or stops | Actual response and group condition | ___ |
| Bottle supply returns | Sequence of lane readiness | ___ |
| First accepted carton | Verified count and elapsed time | ___ |
Add a witnessed low-supply restart to the inspection
Assess a multi-lane packer
Send bottle pattern, lane count, target speed and expected shortage condition.