Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for secondary-packaging and end-of-line engineers and should be adapted to the actual machine and production project.
Verify identity and scope
Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.
For Used Case Packers, pay particular attention to packing patterns, product handling and changeover.
Inspect condition
Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.
For Used Case Packers, pay particular attention to packing patterns, product handling and changeover.
Test with evidence
Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.